2018 CFSEI AWARD WINNERS

CFSEI INNOVATIVE DETAIL AWARD WINNER

FIRST PLACE

Photo left to right: Georgi Hall, 2017-2018 Chair, CFSEI Executive Committee; Andrew Zafrin, ZFA Structural EngineersZFA STRUCTURAL ENGINEERS – SWOOPING EYEBROW DETAIL - GRATON RANCHERIA RESORT HOTEL, ROHNERT PARK, CA

Graton Rancheria Resort Hotel
Rohnert Park, CA

Photo: Graton Rancheria Resort HotelOwner: RT Browning
Architect of Record: Friedmutter Group
Award Entry Submitted by: Dennis Fagent & Andrew Zafrin, ZFA Structural Engineers


 

CFSEI DESIGN EXCELLENCE AWARD WINNERS

FIRST PLACE/RESIDENTIAL

Left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Brent Owens, P.E., ClarkDietrich Engineering ServicesCLARKDIETRICH ENGINEERING SERVICES – AIT BARRACKS COMPLEX PHASE 1, MONTEREY, CA

AIT Barracks Complex Phase-1
1759 Lewis Road
Monterey, CA 93944

Completed: Fall 2017
Construction Cost: $56 million

Photo: AIT Barracks Complex Phase-1Owner: U.S. Army Corps of Engineers
Architect: SVA Architects, Inc.
Architect of Record: Christopher Coyle, AIA
Engineer of Record for Structural Work: McClure Engineering Company
Cold-Formed Steel Specialty Engineer:
ClarkDietrich Engineering Services
Cold-Formed Steel Specialty Contractor: SWI Finishing, Inc. 
Award Entry Submitted by: Brent Owens, P.E., ClarkDietrich Engineering Services

Project Summary Details

 

FIRST PLACE/MUNICIPAL

Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Robert Warr, P.E., Frameworks EngineeringFRAMEWORKS ENGINEERING  – TRINIDAD BAPTIST CHURCH, CAPITOL HEIGHTS, MD

Trinidad Baptist Church
6611 Walker Mill Road
Capitol Heights, MD 20743

Completed: June 2017
Construction Cost:

Owner: Trinidad Baptist Church
Architect of Record: Arel Architects
Photo by Frameworks EngineeringEngineer of Record for Structural Work: SEG, Inc.
Cold-Formed Steel Specialty Engineer:
Frameworks Engineering
Cold-Formed Steel Specialty Contractor: Panel Systems, Inc. 
Award Entry Submitted by: Robert Warr, P.E., Frameworks Engineering.

 

FIRST PLACE/COMMERCIAL

Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Patrick Hainault, P.E., Matsen Ford Design Associates, Inc.MATSEN FORD DESIGN ASSOCIATES, INC -  1600 WEST LOOP SOUTH BALLROOM CEILING, HOUSTON, TX

1600 West Loop South-Ballroom Ceiling
1600 West Loop South
Houston, TX

Completed: March 20187
Construction Cost: $350 million

Photo Matsen Ford Design Associates, Inc.Owner: Fertitta Entertainment/Landry's, Inc.
Architect: Gensler
Architect of Record:
Willie Kirkpatrick
Engineer of Record for Structural Work: Walter P. Moore
Cold-Formed Steel Specialty Engineer:
Matsen Ford Design Associates, Inc.
Cold-Formed Steel Specialty Contractor: Texas Exterior Systems, LLC. 
Award Entry Submitted by: Katie Benjamin, Matsen Ford Design Associates, Inc.

 

SECOND PLACE

Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Georgi Hall, P.E., CEMCOCEMCO - PARK LANE ALA MOANA, HONOLULU, HI

Park Lane Ala Moana
1388 Ala Moana Blvd
Honolulu, HI 96814

Completed: October 2017
Construction Cost: $1 billion

Photo CEMCO - Park Lane Ala MoanaOwner: Kabayashi/MacNaughton Group
Architect : Solomon Cordwell Buenz
Engineer of Record for Structural Work: Magnusson Klemencic
Cold-Formed Steel Specialty Engineer: CEMCO
Cold-Formed Steel Specialty Contractor:  Group Builders, Inc. 
Award Entry Submitted by: Akira Usami, CEMCO

 

SECOND PLACE

Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Daniel Stadig, P.E., The Leffler GroupTHE LEFFLER GROUP - BAY AREA REFINERY, WHARF CENTRAL CONTROL BUILDING, MARTINEZ, CA

"Bay Area Refinery" Wharf Central Control Building
Martinez, CA

Completed: August 2017
Construction Cost: $1.6 million
(relocation and other costs unknown)

Photo The Leffler GroupOwner: "Bay Area Refinery"
Architect: Smith LaRock Architecture P.C.
Architect of Record: Michael B. Smith RA
Engineer of Record for Structural Work: The Leffler Group
Cold-Formed Steel Specialty Contractor:  Denham Contracting Inc. 
Award Entry Submitted by: Daniel Stadig, P.E., The Leffler Group

Project Summary Details

 

 

SECOND PLACE

EXCEL ENGINEERING - PINNACLE BANK ARENA, LINCOLN, NE

Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Jeffrey Kreinke, P.E., S.E., Excel EngineeringPinnacle Bank Arena
400 Pinnacle Arena Drive
Lincoln, NE 68501

Completed: August 2013
Construction Cost: $179 million

Photo Excel EngineeringOwner: PC Sports
Architect: DLR Group
Architect of Record: Jay Jaros
Engineer of Record for Structural Work: Buro Happold
Cold-Formed Steel Specialty Engineer: Excel Engineering
Cold-Formed Steel Specialty Contractor: Falewitch Construction Service 
Award Entry Submitted by: Jeffrey Kreinke, P.E., S.E., Excel Engineering. 

THIRD PLACE

RADIUS TRACK CORPORATION -  DUKE ELLINGTON SCHOOL OF ARTS, Photo left to right: Paul Dalia, P.E., Chair, CFSEI Photo left to right: Paul Dalia, P.E., Chair, CFSEI Executive Committee; Sheri Carter, Radius Track CorporationWASHINGTON, DC

Duke Ellington School of the Arts
1680 35th Street NW
Washington, DC 20007

Completed: August 2017
Construction Cost: $145 million

Duke Ellington School of the ArtsOwner: Districk of Columbia Public Schools | DGS
Architect: A Joint Venture of Lance Bailey Associates, Inc./ Cox Graae + Spack Architects 
Architect of Record: Chris Ambridge
Engineer of Record for Structural Work: RESTL Designers, Inc.
Cold-Formed Steel Specialty Engineer: Studio NYL
Cold-Formed Steel Specialty Contractor: Performance Contracting, Inc. 
Award Entry Submitted by: Chuck Mears, FAIA, Radius Track Corporation

 

 Previous CFSEI Award Winners